Barbara David
Barbara and David can finish a piece of work in 101010 and 202020 days respectively. If this work is done by both of them on alternate days (starting with Barbara), how many days will it take for them to finish the work???


Answer:

131313 days

Step by Step Explanation:
  1. 10 = rem
    m = 10
    n = 5
  2. Barbara takes 101010 days to finish the work. So in 111 day, she finishes 110110110 of the work.
  3. David takes 202020 days to finish the work. So in 111 day, he finishes 120120120 of the work.
  4. Since the work is done on alternate days, so the work done in two days =110+120=2+120=320=110+120=2+120=320=110+120=2+120=320
  5. Multiply 320320320 by number such that it is less than or equal to 1.1.1.
    The work done in 121212 days =6×320=910=6×320=910=6×320=910
  6. Remaining work =1910=110=1910=110=1910=110
  7. Since, they work in alternate days, on 13th13th13th day remaining work 110110110 is done by Barbara.
  8. Thus, they will take 131313 days to finish the work.

You can reuse this answer
Creative Commons License